SCOPE OF PROJECT
Civil work
- Grinding of existing vegetation.
- Right of way felling, taking out the vegetal and mineral layers with the help of bulldozers and excavators.
- Trenching for pipe laying with Veermer T1055 trenching machine.
- Grinding and extension of material produced in excavation, as well as material produced in felling of right of way.
- Loading and transport of abundant material.
Mechanic work
- Unloading and laying of 30” pipe over the right of way, with vacuum depressor.
- Welding and alignment of 30” pipe.
- Manufacturing of curves of different angles according to terrain features.
- Sandblast in each joint.
- Application of corrosion protection system (protall) in each joint.
- 30” pipe laying with the support of pipe-laying machine.
GALLERY:
TYPE OF WORK: Civil Work - Mechanic Work CUSTOMER: GRUPO ALDESA PLACE: SABINAS HIDALGO – ESCOBEDO, NUEVO LEÓN CONTRACT NUMBER: 4103P00044C20170000039 |