Installation of underground grounding network for electric building of steam turbine and electric rods, powerhouse and air condenser. The objective is to build a thermoelectric plant which generates electricity through gas, contaminating the environment as little as possible, and providing electricity to a higher number of people.

SCOPE OF PROJECT

  • Installation of underground and aerial physical grounding for electric rods.
  • Deltas and connections with exothermic welding using the appropriate moulding.
  • Connection of grounding lines to the structures with exothermic welding, using the connection with pads and screws.
  • Work with trenching and hand machinery based on the procedures established by engineering.
  • Installation in base structure with electric rod of 1m, diameter 20mm, and 20 m high.
  • Installation of bare wire, soft tempering, cal. 4/0 AWG, fixed in structure with copper cuff, concrete crossed protection, with CONDUIT tube.
  • Installation at 30 m. of NPT of Copperweld rod-type electrode of ¾# diameter and 3 m. long.
  • Digging and filling in type-II, “B” terrain.
  • Installation of exothermic wire and welding.
  • Floor level mounting and carbon steel, connection and electric tests (including provision and making of primary and finished carbon Steel supports).
  • Installation of 3X2 AWG wire.
  • Installation of 60X60X20 cm metallic boxes over provisional, low power line.
  • Installation of 3” diameter polyduct in digging over fence.
  • Digging in natural terrain, 80 cm Deep, 30 cm wide.

GALLERY:

TYPE OF WORK: Electric Work

CUSTOMER: AVANZIA

PLACE: ECATEPEC, ESTADO DE MÉXICO

CONTRACT NUMBER: SUB-VDM-17-1012 Rev.0

TAGS: